For free fundamentals, start with ENTSO-E's free re-use items, GIE AGSI+ and ALSI, and Elexon: all three let you store, republish and feed the data to an AI model, with credit. For paid forecasts behind an API, Energy Quantified. For a terminal, LSEG Workspace. Exchange prices are the exception: no AI use without the exchange's licence.
Two things are new in this edition. A licence column says, for each source, whether you may store it, republish it and feed it to an AI model or agent. A revisions column says whether the publisher changes values after first publication: in our own capture, GIE corrected 14 of 36 gas days of EU storage and 31 of 39 gas days of EU LNG send-out between 23 Sep and 28 Oct 2026, and we read both as a minimum.
What is different from the 2026 edition
The 2026 edition (last reviewed 24 Sep 2026) stays online as published, with its integration notes and list prices as of that date. This edition changes the following.
- A licence column for AI use. Taken from our reading of each source's own terms on 20 Oct 2026. The JAO, Euronext, EPEX and EEX texts behind the 2027 section were read again on 29 Oct 2026. It is a reading of terms, not legal advice.
- A revisions column. For GIE AGSI+, GIE ALSI and ENTSO-E imbalance prices it gives counts of corrections from our own capture, published with the method and the change records. For everything else it says “not measured”.
- Nine sources added. NESO, NVE, Gassco, National Gas, SMARD, RTE, JAO, Nord Pool REMIT UMM and netztransparenz.de join the table for their licence and revisions answers. They have no score yet; we score them at the January review.
- SMARD prices, corrected. The 2026 edition said SMARD publishes DE-LU and NL day-ahead prices under CC BY 4.0. SMARD's own manual names the exchanges as the primary owners of wholesale prices, so treat them as needing the exchange's permission.
- FRED and Open-Meteo's free tier move to “not without permission”. FRED's terms bar storing or caching its data and using its API in connection with AI development or training, so we no longer suggest it for a free build. Open-Meteo's free API was always non-commercial; a product or an AI feature needs a paid plan.
- Scores unchanged. The scores are those set in June 2026 and re-checked on 24 Sep. The two new columns sit beside the score rather than inside it, so you can weigh them yourself.
Five criteria and two new columns
Each scored source is rated 0 to 10 on the five builder criteria of the 2026 edition. It weights how easy the data is to integrate and run, not how prestigious the brand is.
- Coverage & authority (30%): breadth, and whether the data is primary or official.
- Developer experience (25%): docs, SDKs, formats, auth simplicity.
- Latency & granularity (20%): how fresh and how fine-grained.
- Reliability & limits (15%): uptime, rate limits, redistribution rights.
- Value for money (10%): cost against what you actually get.
The two new columns
- Licence for AI use: may you store the data, republish it, and feed it to an AI model or agent? “Open with credit” means yes to all three if the credit line travels with the data. “Get it in writing” means the terms lean yes but do not say so. “Not without permission” means the terms need the owner's consent or a licence that names the use. “Your contract” means a commercial licence we did not review.
- Revisions: does the publisher change values after first publication? We record every published value each time we fetch it, so a correction shows up as a value that differs from the first one we saw. Where we have counted, the column says so and the section below gives the counts; elsewhere it says “not measured”, which does not mean values never change.
Every source, rated, with licence and revisions
| # | Source | Category | Cost | Score | AI-use licence | Revisions |
|---|---|---|---|---|---|---|
| 01 | ENTSO-E Transparency Platform | Free official · power | Free | 9.3 | Split by item | Measured for Spain and Austria imbalance prices; other items not measured |
| 02 | GIE AGSI+ / ALSI | Free official · gas/LNG storage | Free | 9.1 | Open with credit | Measured for EU storage and EU LNG send-out |
| 03 | Elexon BMRS (Insights) | Free official · GB power | Free | 8.9 | Open with credit | Not measured |
| 04 | Open-Meteo | Free · weather | Free (non-commercial) | 8.8 | Not without permission | Not measured |
| 05 | ENTSOG Transparency | Free official · gas flows | Free | 8.6 | Get it in writing | Not measured |
| 06 | Energy Quantified (Montel) | Commercial · analytics API | €€ | 8.6 | Your contract | Not measured |
| 07 | Kpler | Commercial · flows/LNG | €€€ | 8.5 | Your contract | Not measured |
| 08 | ICIS / Platts / Argus | Commercial · PRA prices | €€€ | 8.5 | Your contract | Not measured |
| 09 | LSEG Workspace / Data Library | Terminal · cross-asset | €€€€ | 8.5 | Your contract | Not measured |
| 10 | EEX Market Data (ICE: your contract) | Exchange · futures | €€€ | 8.4 | Not without permission | Not measured |
| 11 | Bloomberg Terminal (BLPAPI) | Terminal · cross-asset | €€€€ | 8.3 | Your contract | Not measured |
| 12 | FRED (St. Louis Fed) | Free · commodity macro | Free | 8.2 | Not without permission | Not measured |
| 13 | Montel Markets | Commercial · prices + news | €€ | 8.2 | Your contract | Not measured |
| 14 | Volue Insight | Commercial · fundamentals | €€€ | 8.2 | Your contract | Not measured |
| 15 | Nord Pool Data Portal | Exchange · Nordic/EU power | €€ | 8.1 | Not without permission | Not measured |
| 16 | NESO Data Portal | Free official · GB system | Free | Not yet | Open with credit | Not measured |
| 17 | NVE reservoir statistics | Free official · Norway hydro | Free | Not yet | Open with credit | Not measured |
| 18 | Gassco (UMM, nominations, flows) | Free official · Norway gas | Free | Not yet | Open with credit | Not measured |
| 19 | National Gas (GB) | Free official · GB gas | Free | Not yet | Get it in writing | Not measured |
| 20 | SMARD (Bundesnetzagentur) | Free official · DE power | Free | Not yet | Split by item | Not measured |
| 21 | RTE data portal | Free official · FR power | Free | Not yet | Get it in writing | Not measured |
| 22 | JAO | Free official · capacity | Free | Not yet | Not without permission | Not measured |
| 23 | Nord Pool REMIT UMM | Free · outage messages | Free | Not yet | Not without permission | Not measured |
| 24 | netztransparenz.de | Free official · DE TSOs | Free | Not yet | Not without permission | Not measured |
| * | Voltstack (disclosed) | Disclosed · not rated or ranked | Trial | Not rated | Each source's own licence | Keeps past values for the series named in its entry |
Licence detail: store, republish, feed to an AI model
Read on 20 Oct 2026 from each source's own terms; JAO, Euronext, EPEX and EEX read again on 29 Oct 2026. “Not established” means the terms we read do not settle it.
| Source or item | Store | Republish | Feed to AI | Basis |
|---|---|---|---|---|
| ENTSO-E, items on the free re-use list (load forecasts 6.1.b to e, cross-border flows 12.1.g, transfer capacities, redispatch 13.1, balancing and imbalance, Art. 17) | Yes | With credit | With credit | CC BY 4.0 under the List of Data Available for Free Re-use (18 Oct 2023) and the Terms of Use applicable from 1 Nov 2023. Credit "ENTSO-E Transparency Platform", link the licence, note changes. IFA and Nemo Link data are excluded. |
| ENTSO-E, items off the list (day-ahead prices 12.1.d, actual total load 6.1.a, generation and outages, Arts 14 to 16) | Not established | Owner's agreement | Owner's agreement | Terms of Use 3.1 (prior agreement of the primary owner) and 5.1 (platform rights cannot be sub-licensed). |
| GIE AGSI+ and ALSI | Yes | With credit | With credit | GIE data usage rules: credit GIE, AGSI or ALSI, and put "GIE" in ticker names when you repackage the data. |
| Elexon BMRS and Insights | Yes | With credit | With credit | BMRS open data licence, with its attribution line and licence link. The Market Index (MID) series come from N2EX and APX, so their exchange rights sit outside it. |
| NESO Data Portal | Yes | With credit | With credit | NESO Open Data Licence v1.0: "Supported by National Energy SO Open Data". |
| NVE reservoir statistics | Yes | With credit | With credit | NLOD 2.0: name NVE, link the licence and the service, mark changes. |
| Gassco UMM, nominations and flows | Yes | With credit | With credit | Written reply to us of 11 and 15 Sep 2026: free for anyone to use and reuse, including automated access. Credit "Gassco (umm.gassco.no)". |
| National Gas (GB) | Yes | With credit (written reply to us) | Not addressed | Its website terms and data portal disclaimer ask for written consent. Its written reply to us of 29 Sep 2026 calls the data open and publicly available, reusable with attribution, and does not mention AI. Ask for your own. |
| SMARD, data other than wholesale prices | Yes | With credit | With credit | CC BY 4.0: "Bundesnetzagentur | SMARD.de" with the licence link. It passes on only what the Bundesnetzagentur holds. |
| SMARD, wholesale prices | Not established | Exchange's permission | Exchange's permission | SMARD's own user manual (D.3.1) names the exchanges as the primary owners of wholesale prices. |
| ENTSOG Transparency Platform | Yes | Get it in writing | Get it in writing | Terms of Use Rev. 3 (24 Sep 2018) allow download, storage and use and set a citation, "ENTSOG TP [DD-MM-YYYY] https://transparency.entsog.eu/", but grant no express right to redistribute. |
| RTE data portal, public data | Yes | With credit, unmodified | Get it in writing | Portal terms, Art. 9: reuse with the source named, no modifying or distorting the content, EPEX and Nord Pool data excluded. Nothing on sub-licensing. |
| Open-Meteo, free API | Non-commercial only | Non-commercial only | Non-commercial only | Terms last changed 18 Oct 2026. Paid plans license commercial use of the CC BY 4.0 data; ensemble and previous-run data need API Professional. |
| FRED (EIA and Federal Reserve series) | No | Written consent | No | FRED terms: commercial use needs consent (j); no storing, caching or building a database (p); the API may not be used in connection with AI development or training (k). IMF series add the IMF's own terms. |
| JAO | Not established | Written authorisation | Written authorisation | General Terms and Conditions for the Use of the Information Systems, undated, rewritten in 2026 and in place by 15 Oct 2026. Section A, clause 4: no making content, including derived outputs, available to any third party without prior written authorisation. Section B, clause 2: no training machine-learning models or developing AI in the registered areas without authorisation. |
| netztransparenz.de | Not established | Four TSOs' written consent | Four TSOs' written consent | Impressum, use of the website: reuse needs the prior written consent of the four TSOs (50Hertz, Amprion, TenneT, TransnetBW). |
| Nord Pool REMIT UMM | Internal analysis | Written consent | Written consent | REMIT UMM Services General Terms (Nov 2024): no redistribution and no automatic extraction without express written consent. |
| Nord Pool prices (Data Portal, N2EX) | Under licence | Redistribution licence | Written agreement | Euronext Group Data Product Agreement and Nord Pool product terms from 1 Jan 2026: internal, non-display, view-only and full redistribution licences, with no text on AI. The website terms forbid reuse without consent. |
| EPEX SPOT prices, by any route (direct, ENTSO-E, SMARD) | Under licence | Licence | Written consent | General Conditions of Data Use applicable to EPEX SPOT Information Products, 1 Nov 2025, clause 3.1.2: no use to train, develop, fine-tune, validate or enhance any AI system, ML model or algorithmic process without prior written consent. Via ENTSO-E or SMARD: ENTSO-E Terms of Use 3.1 and SMARD manual D.3.1 name the exchange as owner. |
| EEX DataSource | Under licence | Licence | Separate AI licence | DataSource General Conditions v8 (valid from 1 Nov 2025), s. 3.2.3: AI use needs the appropriate licence. |
| Commercial vendors and terminals (Energy Quantified, Kpler, ICIS, Platts, Argus, Montel, Volue, LSEG, Bloomberg, ICE) | Your contract | Your contract | Your contract | Licensed by contract. Not reviewed here: ask for AI use by name before you sign. |
One rule cuts the other way. CC BY 4.0, NLOD and the open government licences forbid adding terms that restrict the people you pass the data on to, so a product built on them may not forbid its own users from putting that data into AI.
How often values change after first publication
We record every published value of these series each time we fetch them. Between 23 Sep and 28 Oct 2026 we counted how many were changed after we first saw them. Recording for these series began on 23 Sep, so nothing earlier is covered. Each series is re-read only for a limited window, so later corrections go unseen and every count below is a minimum. The method, the limits and the change records are published: the paper (doi:10.5281/zenodo.23749147) and its dataset (doi:10.5281/zenodo.23749094). Both are ours: the author runs Voltstack, and the capture is Voltstack's.
| Series | First seen | Corrected | Detail |
|---|---|---|---|
| EU gas storage volume (GIE AGSI+) | 36 gas days | 14 | Upward in all 14 cases. A minimum: each storage gas day was re-read only until the next one was published. |
| EU LNG send-out (GIE ALSI) | 39 gas days | 31 | 17 of the 31 corrected more than once, up to 4 times; typically 40 hours from first publication to last correction, up to about 3 days. A minimum: only the five most recent gas days were re-read. |
| Spain imbalance price, surplus (ENTSO-E) | 3,674 quarter-hours | 2,423 (66%) | Typically 35 hours from first publication to last correction; 142 corrections flipped the price between positive and negative. A minimum. |
| Spain imbalance price, deficit (ENTSO-E) | 3,677 quarter-hours | 2,456 (67%) | Typically 34.5 hours from first publication to last correction; 140 sign flips. A minimum. |
| Austria imbalance price (ENTSO-E) | 3,274 quarter-hours | 1,606 (49%) | Typically 38 hours after first publication; 27 sign flips. A minimum. |
Imbalance prices keep changing after the window. We re-read them for about three days after delivery, so the counts above include only corrections made in those three days. For delivery on 21 Sep, 96 of the 102 corrected Spanish quarter-hours had changed again by 28 Oct, judged against what ENTSO-E publishes today. A repeat request to these APIs returned the corrected value, so keep the first one yourself if you need it later.
The window is five weeks. Do not read it as “always” or “every winter”. Sources: GIE AGSI+ (https://agsi.gie.eu/) and GIE ALSI (https://alsi.gie.eu/), Gas Infrastructure Europe; ENTSO-E Transparency Platform (https://transparency.entsoe.eu/), CC BY 4.0, aggregated and changed by Voltstack.
Six free official sources you may build on
These six are free to read and, except ENTSOG and ENTSO-E's items off the free re-use list, open to store, republish and feed to an AI model as long as the credit line travels with the data. Integration notes from the 24 Sep review (endpoints, keys, rate limits, parsing traps) are in the 2026 edition.
ENTSO-E Transparency Platform: 9.3
The widest free source of European power fundamentals, but in two halves. The items on ENTSO-E's free re-use list (cross-border flows, load forecasts, transfer capacities, redispatch, balancing and imbalance) are CC BY 4.0. Day-ahead prices, actual total load, and generation and outage data are not on the list and need the owner's agreement before you republish them or feed them to a model. Spain's and Austria's imbalance prices, which are on the list, were corrected often in our capture: see the revisions section.
GIE AGSI+ / ALSI: 9.1
The free standard for EU gas storage and LNG terminal data, with a free key and JSON. Open with credit to GIE, AGSI or ALSI, including for AI use. Both series are corrected after first publication, ALSI most of the time, so store each value with the time you saw it if you need to know later what the number said.
Elexon BMRS (Insights): 8.9
The free route to GB power data: half-hourly generation by fuel and the balancing mechanism, keyless, under a licence that allows commercial re-use and AI use with the Elexon attribution line. Leave out the Market Index (MID) series, which come from the exchanges and carry their rights.
ENTSOG Transparency: 8.6
The free, keyless source for European gas pipeline flows. Its terms allow download, storage and use and set a citation format, but grant no express right to redistribute, so get that in writing before you serve it to others or to their models.
NESO Data Portal: not yet scored
Great Britain's system operator data, including demand and wind forecasts, under the NESO Open Data Licence v1.0. Open with the credit “Supported by National Energy SO Open Data”.
NVE reservoir statistics: not yet scored
Norway's weekly hydro reservoir filling, under the Norwegian open licence NLOD 2.0. Name NVE, link the licence and the service, and mark any changes. Anyone you pass it to holds the same licence from NVE directly.
Paid data, and what the licence lets you do with it
Free official data tells you what happened and what is flowing now. You pay for forward forecasts, vessel and asset-level flows, settlement-grade price assessments and exchange prices. The licence matters as much as the data: on the exchanges' current terms, a licence to display or use prices internally does not by itself let you feed them to a model or show model output to clients.
- Energy Quantified (8.6): the most builder-friendly commercial API, with REST, a WebSocket feed and a Python SDK.
- Kpler (8.5): LNG cargo and pipeline flow tracking over REST and GraphQL, with a Python SDK.
- ICIS / Platts / Argus (8.5): price assessments for OTC settlement, all behind entitlements.
- LSEG Workspace (8.5) and Bloomberg (8.3): terminals for cross-asset coverage and news.
- EEX, ICE and Nord Pool (8.4, 8.1): exchange-direct data on published fees. EEX asks for a separate licence for AI use. Nord Pool's licences say nothing on AI, so get the use in writing.
Before you sign any of these, name the AI use in writing: whether you may put the data into a model or an index, whether the output may reach clients, and whether a vendor's assistant may see it. We did not review these vendors' contracts, which is why the table says “your contract”.
Voltstack, self-assessed: not rated
Voltstack is a browser-based analytics workspace with a read-only data API, built on official European power and gas sources for traders and analysts on European gas and power desks.
What the /v1 API does today
- A read-only JSON API at
https://api.voltstack.energy/v1, with GET endpoints for power, gas, weather and history built on sources such as ENTSO-E, GIE, ENTSOG and National Gas. - The history endpoint takes an
as_oftime and returns what a series said at that moment, live since 23 Sep 2026. - Those past values are captured forward only and cannot be back-filled: NESO and RTE forecasts since 31 Jul 2026; ENTSO-E imbalance prices and cross-border flows, GIE AGSI+ and ALSI since 23 Sep 2026; Gassco since 24 Sep 2026; NVE since 21 Oct 2026. Other series are served as currently published.
- Keys go in an
X-API-Keyheader and are issued on request by email to research@voltstack.energy. There is no self-serve key; without one you get a labelled sample. - Each response names its upstream source. Voltstack grants no right a source does not give, so the licence table above applies to data you reach through it, day-ahead prices included.
Its limits
- It is a secondary source: every value comes from a primary publisher, and it adds no speed of its own.
- In the window the revisions section covers, imbalance prices were re-read for about three days after delivery, so corrections made later were not kept.
- No published price. A 14-day trial covers the app, not an API key.
| Criterion | How Voltstack measures up, in its own words |
|---|---|
| Coverage & authority | Official power and gas sources behind one API, but secondary: every series comes from a primary publisher or is derived from one. |
| Developer experience | JSON over REST with one header for the key, but keys are issued by email and there is no self-serve key. |
| Latency & granularity | Inherits the cadence and resolution of each upstream source; it adds no speed of its own. |
| Reliability & limits | Built to fall back to the ENTSO-E File Library when the Web API fails; a request limit per route. |
| Value for money | A labelled sample without a key and a 14-day app trial, but no published price. |
| Licence for AI use | Data reached through it keeps its source's licence, as in the table above; Voltstack adds no right of its own. |
| Revisions | For the series and start dates listed below, keeps each value it reads with the time it read it and answers what a series said at a past moment; other series are served as currently published. |
We do not rate our own product. Voltstack is set against the same criteria and the two new columns in words, with no score and no rank.
Start a 14-day free trialRequest early access →The button opens a 14-day free trial sign-up. Sign-up needs a work email.
The button opens the early-access request on our home page.
Licence changes builders should plan around
- JAO rewrote its terms in 2026. The current text, undated and in place by 15 Oct 2026, bars making JAO content, including derived outputs, available to any third party without JAO's prior written authorisation (Section A, clause 4), and prohibits training machine-learning models or developing AI in its registered areas without authorisation (Section B, clause 2).
- Euronext treats AI output as redistribution. Its statement of 13 Jul 2026 on its Market Data Agreement and Datafeed Subscriber Agreement counts feeding its data into an AI application as non-display use, and AI output that discloses the data to third parties as redistribution.
- EPEX bars AI use without consent. Its General Conditions of Data Use of 1 Nov 2025 forbid using its information products to train, develop, fine-tune, validate or enhance any AI system, machine-learning model or algorithmic process without prior written consent (clause 3.1.2). EPEX prices that reach you through ENTSO-E or SMARD still need the exchange's agreement (ENTSO-E Terms of Use 3.1; SMARD manual D.3.1).
- EEX makes AI a separate licence. DataSource General Conditions v8, valid from 1 Nov 2025, require anyone using its licensed data within AI solutions to take the appropriate licence (section 3.2.3).
- EEX retired its Transparency API guide. EEX marked its Transparency Data API User Guide (Ref. 8) for decommissioning on 30 Jun 2026, the date it set for retiring the v1 DataSource REST API. By October 2026 the REST API (v2) User Guide had replaced it, with transparency data in its own section, so check code written against the old guide.
Quick answers
What is the best free API for European energy data in 2027?
Can I feed ENTSO-E data to an AI model?
Can I use exchange power prices in an AI model or agent?
Is there a free API for EU gas storage?
Does European energy data get corrected after it is published?
Can I use JAO data in an AI model?
What is the best commercial energy data API?
Which free European energy sources can an AI agent use?
Keep both values, with the time each was seen
If a desk keeps only the latest value, it cannot later show what the number said when it acted. If it keeps only the first, it carries figures that were later changed. Voltstack keeps each value it reads with the time it read it, for the series and start dates in the disclosed entry above.
The button opens a 14-day free trial sign-up. Sign-up needs a work email.
The button opens the early-access request on our home page.
More European energy reference
Disclaimer: This reference is produced by Voltstack Intelligence for informational purposes only and is not a vendor endorsement or legal advice. Scores reflect Voltstack's builder-centric assessment, set in June 2026 and re-checked on 24 Sep 2026. The licence column is our reading of each source's published terms on 20 Oct 2026, with JAO, Euronext, EPEX and EEX read again on 29 Oct 2026; check the terms yourself before you rely on them. Voltstack appears as a disclosed, self-assessed entry and is not rated or ranked. Voltstack does not accept payment from listed providers. Corrections to research@voltstack.energy.
Sources: the terms of use, licences and data usage pages of ENTSO-E, GIE, ENTSOG, Elexon, NESO, NVE, Gassco, National Gas, SMARD (Bundesnetzagentur), RTE, JAO, netztransparenz.de, Nord Pool, Euronext, EPEX SPOT, EEX, Open-Meteo and FRED, and written replies from Gassco, National Gas and the German TSOs; corrections measured from Voltstack's own capture, 23 Sep to 28 Oct 2026 (doi:10.5281/zenodo.23749147).