VOLTSTACKREFERENCE GUIDE
BUILDER REFERENCE · 2027
BUILDER REFERENCE · 2027 EDITION

Best Energy Data APIs (2027): European Power and Gas Market Data, Rated with AI-Use Licences and Revisions

Reviewed ; next review

Updated : where to get EPEX SPOT and Nord Pool historical data legally

THE SHORT ANSWER

For an energy data API with European power market data and gas fundamentals, start with the free official sources: ENTSO-E's free re-use items, GIE AGSI+ and ALSI, and Elexon, all three open to store, republish and feed to an AI model, with credit. For paid forecasts behind an API, Energy Quantified. For a terminal, LSEG Workspace. Exchange prices are the exception: no AI use without the exchange's licence, and EPEX SPOT and Nord Pool sell their price history themselves (where to get it legally).

Two things are new in this edition. A licence column says, for each source, whether you may store it, republish it and feed it to an AI model or agent. A revisions column says whether the publisher changes values after first publication: in our own capture, GIE corrected 14 of 36 gas days of EU storage and 31 of 39 gas days of EU LNG send-out between 23 Sep and 28 Oct 2026, and we read both as a minimum.

REFERENCE DOCUMENTISSUED: 29 Oct 2026NEXT REVIEW: 15 Jan 2027AUTHOR: Voltstack Intelligence
Sources in the table
24
plus Voltstack, disclosed, not rated
Open with credit for AI
5 sources
plus parts of ENTSO-E and SMARD
Not without permission
7 sources
exchange prices by any route among them
ALSI gas days corrected
31 of 39
23 Sep to 28 Oct 2026, a minimum
Changes in this review

What is different from the 2026 edition

The 2026 edition (last reviewed 24 Sep 2026) stays online as published, with its integration notes and list prices as of that date. This edition changes the following.

  • A licence column for AI use. Taken from our reading of each source's own terms on 20 Oct 2026. The JAO, Euronext, EPEX and EEX texts behind the 2027 section were read again on 29 Oct 2026. It is a reading of terms, not legal advice.
  • A revisions column. For GIE AGSI+, GIE ALSI and ENTSO-E imbalance prices it gives counts of corrections from our own capture, published with the method and the change records. For everything else it says “not measured”.
  • Nine sources added. NESO, NVE, Gassco, National Gas, SMARD, RTE, JAO, Nord Pool REMIT UMM and netztransparenz.de join the table for their licence and revisions answers. They have no score yet; we score them at the January review.
  • SMARD prices, corrected. The 2026 edition said SMARD publishes DE-LU and NL day-ahead prices under CC BY 4.0. SMARD's own manual names the exchanges as the primary owners of wholesale prices, so treat them as needing the exchange's permission.
  • FRED and Open-Meteo's free tier move to “not without permission”. FRED's terms bar storing or caching its data and using its API in connection with AI development or training, so we no longer suggest it for a free build. Open-Meteo's free API was always non-commercial; a product or an AI feature needs a paid plan.
  • Exchange price history, added 9 Nov 2026. A section on where to get EPEX SPOT and Nord Pool historical data legally: from the exchanges, through a licensed vendor, and what ENTSO-E's terms allow. The exchanges' offers were read on their own sites on 6 Nov 2026; scores and licence verdicts are unchanged.
  • ENTSO-E exclusions, corrected 9 Nov 2026. The ENTSO-E licence row and the ENTSO-E answer below said only IFA and Nemo Link data were left out of the free re-use list. They now give the list's full exclusions: all data from Moldova and Turkey, and items 24, 26, 29, 30 and 32 to 35 from Ukraine and BritNed as well. The earlier wording “generation and outage data” is also narrowed to “generation data and generation unit outages”, because transmission and interconnector unavailability are on ENTSO-E's list.
  • Scores unchanged. The scores are those set in June 2026 and re-checked on 24 Sep. The two new columns sit beside the score rather than inside it, so you can weigh them yourself.
02 · How we scored them

Five criteria and two new columns

Each scored source is rated 0 to 10 on the five builder criteria of the 2026 edition. It weights how easy the data is to integrate and run, not how prestigious the brand is.

  • Coverage & authority (30%): breadth, and whether the data is primary or official.
  • Developer experience (25%): docs, SDKs, formats, auth simplicity.
  • Latency & granularity (20%): how fresh and how fine-grained.
  • Reliability & limits (15%): uptime, rate limits, redistribution rights.
  • Value for money (10%): cost against what you actually get.

The two new columns

  • Licence for AI use: may you store the data, republish it, and feed it to an AI model or agent? “Open with credit” means yes to all three if the credit line travels with the data. “Get it in writing” means the terms lean yes but do not say so. “Not without permission” means the terms need the owner's consent or a licence that names the use. “Your contract” means a commercial licence we did not review.
  • Revisions: does the publisher change values after first publication? We record every published value each time we fetch it, so a correction shows up as a value that differs from the first one we saw. Where we have counted, the column says so and the section below gives the counts; elsewhere it says “not measured”, which does not mean values never change.
03 · The table

Every source, rated, with licence and revisions

#SourceCategoryCostScoreAI-use licenceRevisions
01ENTSO-E Transparency PlatformFree official · powerFree9.3Split by itemMeasured for Spain and Austria imbalance prices; other items not measured
02GIE AGSI+ / ALSIFree official · gas/LNG storageFree9.1Open with creditMeasured for EU storage and EU LNG send-out
03Elexon BMRS (Insights)Free official · GB powerFree8.9Open with creditNot measured
04Open-MeteoFree · weatherFree (non-commercial)8.8Not without permissionNot measured
05ENTSOG TransparencyFree official · gas flowsFree8.6Get it in writingNot measured
06Energy Quantified (Montel)Commercial · analytics API€€8.6Your contractNot measured
07KplerCommercial · flows/LNG€€€8.5Your contractNot measured
08ICIS / Platts / ArgusCommercial · PRA prices€€€8.5Your contractNot measured
09LSEG Workspace / Data LibraryTerminal · cross-asset€€€€8.5Your contractNot measured
10EEX Market Data (ICE: your contract)Exchange · futures€€€8.4Not without permissionNot measured
11Bloomberg Terminal (BLPAPI)Terminal · cross-asset€€€€8.3Your contractNot measured
12FRED (St. Louis Fed)Free · commodity macroFree8.2Not without permissionNot measured
13Montel MarketsCommercial · prices + news€€8.2Your contractNot measured
14Volue InsightCommercial · fundamentals€€€8.2Your contractNot measured
15Nord Pool Data PortalExchange · Nordic/EU power€€8.1Not without permissionNot measured
16NESO Data PortalFree official · GB systemFreeNot yetOpen with creditNot measured
17NVE reservoir statisticsFree official · Norway hydroFreeNot yetOpen with creditNot measured
18Gassco (UMM, nominations, flows)Free official · Norway gasFreeNot yetOpen with creditNot measured
19National Gas (GB)Free official · GB gasFreeNot yetGet it in writingNot measured
20SMARD (Bundesnetzagentur)Free official · DE powerFreeNot yetSplit by itemNot measured
21RTE data portalFree official · FR powerFreeNot yetGet it in writingNot measured
22JAOFree official · capacityFreeNot yetNot without permissionNot measured
23Nord Pool REMIT UMMFree · outage messagesFreeNot yetNot without permissionNot measured
24netztransparenz.deFree official · DE TSOsFreeNot yetNot without permissionNot measured
*Voltstack (disclosed)Disclosed · not rated or rankedTrialNot ratedEach source's own licenceKeeps past values for the series named in its entry
Cost key: Free · €€ under €25k/yr · €€€ €25k to €100k/yr · €€€€ €100k+/yr. Indicative spend for a desk, not a list price. “Split by item”: some items are open with credit and others need the owner's permission; see the licence detail. * We build Voltstack, so that entry is listed but not rated.

Licence detail: store, republish, feed to an AI model

Read on 20 Oct 2026 from each source's own terms; JAO, Euronext, EPEX and EEX read again on 29 Oct 2026. “Not established” means the terms we read do not settle it.

Source or itemStoreRepublishFeed to AIBasis
ENTSO-E, items on the free re-use list (load forecasts 6.1.b to e, cross-border flows 12.1.g, transfer capacities, redispatch 13.1, balancing and imbalance, Art. 17)YesWith creditWith creditCC BY 4.0 under the List of Data Available for Free Re-use (18 Oct 2023) and the Terms of Use applicable from 1 Nov 2023. Credit "ENTSO-E Transparency Platform", link the licence, note changes. The list excludes all data from Moldova and Turkey, all data from the IFA and Nemo Link interconnectors, and items 24, 26, 29, 30 and 32 to 35 from Ukraine and BritNed.
ENTSO-E, items off the list (day-ahead prices 12.1.d, actual total load 6.1.a, generation and outages, Arts 14 to 16)Not establishedOwner's agreementOwner's agreementTerms of Use 3.1 (prior agreement of the primary owner) and 5.1 (platform rights cannot be sub-licensed).
GIE AGSI+ and ALSIYesWith creditWith creditGIE data usage rules: credit GIE, AGSI or ALSI, and put "GIE" in ticker names when you repackage the data.
Elexon BMRS and InsightsYesWith creditWith creditBMRS open data licence, with its attribution line and licence link. The Market Index (MID) series come from N2EX and APX, so their exchange rights sit outside it.
NESO Data PortalYesWith creditWith creditNESO Open Data Licence v1.0: "Supported by National Energy SO Open Data".
NVE reservoir statisticsYesWith creditWith creditNLOD 2.0: name NVE, link the licence and the service, mark changes.
Gassco UMM, nominations and flowsYesWith creditWith creditWritten reply to us of 11 and 15 Sep 2026: free for anyone to use and reuse, including automated access. Credit "Gassco (umm.gassco.no)".
National Gas (GB)YesWith credit (written reply to us)Not addressedIts website terms and data portal disclaimer ask for written consent. Its written reply to us of 29 Sep 2026 calls the data open and publicly available, reusable with attribution, and does not mention AI. Ask for your own.
SMARD, data other than wholesale pricesYesWith creditWith creditCC BY 4.0: "Bundesnetzagentur | SMARD.de" with the licence link. It passes on only what the Bundesnetzagentur holds.
SMARD, wholesale pricesNot establishedExchange's permissionExchange's permissionSMARD's own user manual (D.3.1) names the exchanges as the primary owners of wholesale prices.
ENTSOG Transparency PlatformYesGet it in writingGet it in writingTerms of Use Rev. 3 (24 Sep 2018) allow download, storage and use and set a citation, "ENTSOG TP [DD-MM-YYYY] https://transparency.entsog.eu/", but grant no express right to redistribute.
RTE data portal, public dataYesWith credit, unmodifiedGet it in writingPortal terms, Art. 9: reuse with the source named, no modifying or distorting the content, EPEX and Nord Pool data excluded. Nothing on sub-licensing.
Open-Meteo, free APINon-commercial onlyNon-commercial onlyNon-commercial onlyTerms last changed 18 Oct 2026. Paid plans license commercial use of the CC BY 4.0 data; ensemble and previous-run data need API Professional.
FRED (EIA and Federal Reserve series)NoWritten consentNoFRED terms: commercial use needs consent (j); no storing, caching or building a database (p); the API may not be used in connection with AI development or training (k). IMF series add the IMF's own terms.
JAONot establishedWritten authorisationWritten authorisationGeneral Terms and Conditions for the Use of the Information Systems, undated, rewritten in 2026 and in place by 15 Oct 2026. Section A, clause 4: no making content, including derived outputs, available to any third party without prior written authorisation. Section B, clause 2: no training machine-learning models or developing AI in the registered areas without authorisation.
netztransparenz.deNot establishedFour TSOs' written consentFour TSOs' written consentImpressum, use of the website: reuse needs the prior written consent of the four TSOs (50Hertz, Amprion, TenneT, TransnetBW).
Nord Pool REMIT UMMInternal analysisWritten consentWritten consentREMIT UMM Services General Terms (Nov 2024): no redistribution and no automatic extraction without express written consent.
Nord Pool prices (Data Portal, N2EX)Under licenceRedistribution licenceWritten agreementEuronext Group Data Product Agreement and Nord Pool product terms from 1 Jan 2026: internal, non-display, view-only and full redistribution licences, with no text on AI. The website terms forbid reuse without consent.
EPEX SPOT prices, by any route (direct, ENTSO-E, SMARD)Under licenceLicenceWritten consentGeneral Conditions of Data Use applicable to EPEX SPOT Information Products, 1 Nov 2025, clause 3.1.2: no use to train, develop, fine-tune, validate or enhance any AI system, ML model or algorithmic process without prior written consent. Via ENTSO-E or SMARD: ENTSO-E Terms of Use 3.1 and SMARD manual D.3.1 name the exchange as owner.
EEX DataSourceUnder licenceLicenceSeparate AI licenceDataSource General Conditions v8 (valid from 1 Nov 2025), s. 3.2.3: AI use needs the appropriate licence.
Commercial vendors and terminals (Energy Quantified, Kpler, ICIS, Platts, Argus, Montel, Volue, LSEG, Bloomberg, ICE)Your contractYour contractYour contractLicensed by contract. Not reviewed here: ask for AI use by name before you sign.

One rule cuts the other way. CC BY 4.0, NLOD and the open government licences forbid adding terms that restrict the people you pass the data on to, so a product built on them may not forbid its own users from putting that data into AI.

03b · Revisions, measured

How often values change after first publication

We record every published value of these series each time we fetch them. Between 23 Sep and 28 Oct 2026 we counted how many were changed after we first saw them. Recording for these series began on 23 Sep, so nothing earlier is covered. Each series is re-read only for a limited window, so later corrections go unseen and every count below is a minimum. The method, the limits and the change records are published: the paper (doi:10.5281/zenodo.23749147) and its dataset (doi:10.5281/zenodo.23749094). Both are ours: the author runs Voltstack, and the capture is Voltstack's.

SeriesFirst seenCorrectedDetail
EU gas storage volume (GIE AGSI+)36 gas days14Upward in all 14 cases. A minimum: each storage gas day was re-read only until the next one was published.
EU LNG send-out (GIE ALSI)39 gas days3117 of the 31 corrected more than once, up to 4 times; typically 40 hours from first publication to last correction, up to about 3 days. A minimum: only the five most recent gas days were re-read.
Spain imbalance price, surplus (ENTSO-E)3,674 quarter-hours2,423 (66%)Typically 35 hours from first publication to last correction; 142 corrections flipped the price between positive and negative. A minimum.
Spain imbalance price, deficit (ENTSO-E)3,677 quarter-hours2,456 (67%)Typically 34.5 hours from first publication to last correction; 140 sign flips. A minimum.
Austria imbalance price (ENTSO-E)3,274 quarter-hours1,606 (49%)Typically 38 hours after first publication; 27 sign flips. A minimum.

Imbalance prices keep changing after the window. We re-read them for about three days after delivery, so the counts above include only corrections made in those three days. For delivery on 21 Sep, 96 of the 102 corrected Spanish quarter-hours had changed again by 28 Oct, judged against what ENTSO-E publishes today. A repeat request to these APIs returned the corrected value, so keep the first one yourself if you need it later.

The window is five weeks. Do not read it as “always” or “every winter”. Sources: GIE AGSI+ (https://agsi.gie.eu/) and GIE ALSI (https://alsi.gie.eu/), Gas Infrastructure Europe; ENTSO-E Transparency Platform (https://transparency.entsoe.eu/), CC BY 4.0, aggregated and changed by Voltstack.

04 · The free core for 2027

Six free official sources you may build on

These six are free to read and, except ENTSOG and ENTSO-E's items off the free re-use list, open to store, republish and feed to an AI model as long as the credit line travels with the data. Integration notes from the 24 Sep review (endpoints, keys, rate limits, parsing traps) are in the 2026 edition.

ENTSO-E Transparency Platform: 9.3

The widest free source of European power fundamentals, but in two halves. The items on ENTSO-E's free re-use list (cross-border flows, load forecasts, transfer capacities, redispatch, balancing and imbalance) are CC BY 4.0. Day-ahead prices, actual total load, generation data and generation unit outages are not on the list and need the owner's agreement before you republish them or feed them to a model. Spain's and Austria's imbalance prices, which are on the list, were corrected often in our capture: see the revisions section.

GIE AGSI+ / ALSI: 9.1

The free standard for EU gas storage and LNG terminal data, with a free key and JSON. Open with credit to GIE, AGSI or ALSI, including for AI use. Both series are corrected after first publication, ALSI most of the time, so store each value with the time you saw it if you need to know later what the number said.

Elexon BMRS (Insights): 8.9

The free route to GB power data: half-hourly generation by fuel and the balancing mechanism, keyless, under a licence that allows commercial re-use and AI use with the Elexon attribution line. Leave out the Market Index (MID) series, which come from the exchanges and carry their rights.

ENTSOG Transparency: 8.6

The free, keyless source for European gas pipeline flows. Its terms allow download, storage and use and set a citation format, but grant no express right to redistribute, so get that in writing before you serve it to others or to their models.

NESO Data Portal: not yet scored

Great Britain's system operator data, including demand and wind forecasts, under the NESO Open Data Licence v1.0. Open with the credit “Supported by National Energy SO Open Data”.

NVE reservoir statistics: not yet scored

Norway's weekly hydro reservoir filling, under the Norwegian open licence NLOD 2.0. Name NVE, link the licence and the service, and mark any changes. Anyone you pass it to holds the same licence from NVE directly.

05 · When to pay

Paid data, and what the licence lets you do with it

Free official data tells you what happened and what is flowing now. You pay for forward forecasts, vessel and asset-level flows, settlement-grade price assessments and exchange prices. The licence matters as much as the data: on the exchanges' current terms, a licence to display or use prices internally does not by itself let you feed them to a model or show model output to clients.

  • Energy Quantified (8.6): the most builder-friendly commercial API, with REST, a WebSocket feed and a Python SDK.
  • Kpler (8.5): LNG cargo and pipeline flow tracking over REST and GraphQL, with a Python SDK.
  • ICIS / Platts / Argus (8.5): price assessments for OTC settlement, all behind entitlements.
  • LSEG Workspace (8.5) and Bloomberg (8.3): terminals for cross-asset coverage and news.
  • EEX, ICE and Nord Pool (8.4, 8.1): exchange-direct data on published fees. EEX asks for a separate licence for AI use. Nord Pool's licences say nothing on AI, so get the use in writing.

Before you sign any of these, name the AI use in writing: whether you may put the data into a model or an index, whether the output may reach clients, and whether a vendor's assistant may see it. We did not review these vendors' contracts, which is why the table says “your contract”.

05b · Exchange price history

Where to get EPEX SPOT and Nord Pool historical data legally

ENTSO-E, SMARD and RTE all show exchange day-ahead prices free of charge, but none of them passes on the exchange's rights in those prices. That leaves three routes to EPEX SPOT and Nord Pool history: buy it from the exchange, take it through a licensed vendor, or read what ENTSO-E publishes within the limits of its terms. The exchanges' offers below were read on their own sites on 6 Nov 2026; the licence terms come from our reading of 20 Oct 2026, with EPEX and Euronext read again on 29 Oct 2026. We print no prices or fees, so ask the seller for the current list. It is a reading of terms, not legal advice.

RouteWhat you getWhat the licence lets you do
EPEX SPOT, through the EEX Group webshopSubscriptions updated daily or one-off historical data files, as CSV by FTP or web share; API access for real-time trades and ordersInternal use within the buying legal entity. External use needs a separate agreement with EPEX SPOT. AI use needs its prior written consent.
Nord Pool Data Portal and APIHistorical datasets as far back as 1992, as CSV or Excel, and a JSON API, on annual subscriptionsLicences including internal use, view-only, non-display and full redistribution. Its licences say nothing on AI, so get that use in writing.
A licensed vendor or terminalExchange prices inside the vendor's own productYour contract with the vendor.
ENTSO-E Transparency Platform, item 12.1.dDay-ahead prices for each bidding zone, free of chargeNot on the free re-use list. Republishing, serving clients or AI use needs the exchange's agreement; internal use is not settled by the terms.
SMARD and the RTE data portalWholesale prices shown free of chargeBoth name the exchanges as owners. RTE allows internal or personal use only.

From the exchange

EPEX SPOT sells its market data through the EEX Group webshop, either as subscriptions updated daily or as one-off historical data files, delivered as CSV files by FTP or web share, with API access for real-time trades and orders. A webshop subscription is for internal use within the legal entity that buys it. Display on a website, indexation, redistribution and use in marketing material count as external use, for which EPEX SPOT sends a quote and signs a separate agreement. Its General Conditions of Data Use of 1 Nov 2025 also bar using its data to train, develop, fine-tune, validate or enhance any AI system, machine-learning model or algorithmic process without prior written consent (clause 3.1.2).

Nord Pool sells its power market data through a JSON API and its Data Portal, which holds historical datasets as far back as 1992 for day-ahead and intraday auctions, continuous intraday trading, the N2EX and other GB auctions, and power system data, exported as CSV or Excel on annual subscriptions by number of users. Use is licensed under the Euronext Group Data Product Agreement and Nord Pool's product terms from 1 Jan 2026, including internal use, view-only, non-display and full redistribution licences, with a redistribution fee on top of the data fee where one applies. Special terms apply to trading members, students, researchers and academic users. Nord Pool's website terms forbid republishing without its consent and automatic extraction of data, so a script that reads the portal's open pages is no substitute for a licence. Its licences say nothing on AI, so get that use in writing.

From a licensed vendor

Data vendors and terminals carry exchange prices under their own agreements with the exchanges, and Nord Pool sells redistribution licences for that purpose. Of the sources rated above, Montel Markets carries EPEX SPOT and Nord Pool prices, as our 2026 provider ratings note. What you may do with the history is set by your contract with the vendor, which we did not review, so name each use before you sign: keeping the history, showing it to clients, putting it into a model. One condition comes from the exchange: under Nord Pool's full redistribution terms, the vendor must limit its own subscribers to internal, non-commercial use and forbid them to pass the data on (Product Terms 3.2.3 and 3.3.2).

What ENTSO-E carries, and what its terms allow

The ENTSO-E Transparency Platform publishes day-ahead prices for each bidding zone (item 12.1.d), free of charge, but item 12.1.d is not on ENTSO-E's List of Data Available for Free Re-use (18 Oct 2023), so the CC BY 4.0 grant does not reach it. Under the Terms of Use, re-use that risks prejudicing the primary owner's rights needs that owner's prior agreement (3.1); the owners of these prices are the exchanges; and ENTSO-E's own rights in the platform cannot be sub-licensed (5.1). So republishing the prices, serving them to clients or feeding them to an AI model needs the exchange's agreement. The terms do not settle whether purely internal analysis needs it too.

What ENTSO-E does let you build on is the free re-use list: cross-border physical flows, load forecasts, transfer capacities, redispatch, and balancing and imbalance prices are CC BY 4.0 and open with credit. The list itself leaves out all data from Moldova and Turkey, all data provided by the IFA and Nemo Link interconnectors, and items 24, 26, 29, 30 and 32 to 35 from Ukraine and from BritNed, among them procured balancing capacity and aggregated balancing energy bids.

The other free sites that show exchange prices follow the same rule. SMARD's own manual names the exchanges as the primary owners of wholesale prices (D.3.1). The RTE data portal limits EPEX SPOT and Nord Pool data to internal or personal use, with the source and owner named, and needs their written consent for commercial use, indices built for others or distribution.

06 · Disclosed Entry

Voltstack, self-assessed: not rated

We build Voltstack; this entry is self-assessed, and we do not rank it.

Voltstack is a browser-based analytics workspace with a read-only data API, built on official European power and gas sources for traders and analysts on European gas and power desks.

What the /v1 API does today

  • A read-only JSON API at https://api.voltstack.energy/v1, with GET endpoints for power, gas, weather and history built on sources such as ENTSO-E, GIE, ENTSOG and National Gas.
  • The history endpoint takes an as_of time and returns what a series said at that moment, live since 23 Sep 2026.
  • Those past values are captured forward only and cannot be back-filled: NESO and RTE forecasts since 31 Jul 2026; ENTSO-E imbalance prices and cross-border flows, GIE AGSI+ and ALSI since 23 Sep 2026; Gassco since 24 Sep 2026; NVE since 21 Oct 2026. Other series are served as currently published.
  • Keys go in an X-API-Key header and are issued on request by email to research@voltstack.energy. There is no self-serve key; without one you get a labelled sample.
  • Each response names its upstream source. Voltstack grants no right a source does not give, so the licence table above applies to data you reach through it, day-ahead prices included.

Its limits

  • It is a secondary source: every value comes from a primary publisher, and it adds no speed of its own.
  • In the window the revisions section covers, imbalance prices were re-read for about three days after delivery, so corrections made later were not kept.
  • No published price. A 14-day trial covers the app, not an API key.
CriterionHow Voltstack measures up, in its own words
Coverage & authorityOfficial power and gas sources behind one API, but secondary: every series comes from a primary publisher or is derived from one.
Developer experienceJSON over REST with one header for the key, but keys are issued by email and there is no self-serve key.
Latency & granularityInherits the cadence and resolution of each upstream source; it adds no speed of its own.
Reliability & limitsBuilt to fall back to the ENTSO-E File Library when the Web API fails; a request limit per route.
Value for moneyA labelled sample without a key and a 14-day app trial, but no published price.
Licence for AI useData reached through it keeps its source's licence, as in the table above; Voltstack adds no right of its own.
RevisionsFor the series and start dates listed below, keeps each value it reads with the time it read it and answers what a series said at a past moment; other series are served as currently published.

We do not rate our own product. Voltstack is set against the same criteria and the two new columns in words, with no score and no rank.

Start a 14-day free trialRequest early access →

The button opens a 14-day free trial sign-up. Sign-up needs a work email.

The button opens the early-access request on our home page.

07 · What changes in 2027

Licence changes builders should plan around

  • JAO rewrote its terms in 2026. The current text, undated and in place by 15 Oct 2026, bars making JAO content, including derived outputs, available to any third party without JAO's prior written authorisation (Section A, clause 4), and prohibits training machine-learning models or developing AI in its registered areas without authorisation (Section B, clause 2).
  • Euronext treats AI output as redistribution. Its statement of 13 Jul 2026 on its Market Data Agreement and Datafeed Subscriber Agreement counts feeding its data into an AI application as non-display use, and AI output that discloses the data to third parties as redistribution.
  • EPEX bars AI use without consent. Its General Conditions of Data Use of 1 Nov 2025 forbid using its information products to train, develop, fine-tune, validate or enhance any AI system, machine-learning model or algorithmic process without prior written consent (clause 3.1.2). EPEX prices that reach you through ENTSO-E or SMARD still need the exchange's agreement (ENTSO-E Terms of Use 3.1; SMARD manual D.3.1).
  • EEX makes AI a separate licence. DataSource General Conditions v8, valid from 1 Nov 2025, require anyone using its licensed data within AI solutions to take the appropriate licence (section 3.2.3).
  • EEX retired its Transparency API guide. EEX marked its Transparency Data API User Guide (Ref. 8) for decommissioning on 30 Jun 2026, the date it set for retiring the v1 DataSource REST API. By October 2026 the REST API (v2) User Guide had replaced it, with transparency data in its own section, so check code written against the old guide.
08 · Quick answers

Quick answers

What is the best free API for European energy data in 2027?

For gas, GIE AGSI+ and ALSI (storage and LNG terminals, free key). For power, the items on ENTSO-E's free re-use list: cross-border flows, load forecasts, transfer capacities, redispatch and balancing. For GB power, Elexon's keyless Insights API. All three let you store, republish and feed the data to an AI model, with credit. ENTSO-E's day-ahead prices and generation data are not on that list.

Can I feed ENTSO-E data to an AI model?

Yes for the items on ENTSO-E's List of Data Available for Free Re-use, which are CC BY 4.0: credit the ENTSO-E Transparency Platform, link the licence and say what you changed. No for items off the list, such as day-ahead prices, actual total load, generation data and generation unit outages, which need the owner's agreement. The list itself leaves out all data from Moldova and Turkey, all data from the IFA and Nemo Link interconnectors, and items 24, 26, 29, 30 and 32 to 35 from Ukraine and BritNed, among them procured balancing capacity and aggregated balancing energy bids.

Can I use exchange power prices in an AI model or agent?

Not without the exchange's written permission or a licence that names the use, whichever route the prices reach you by. EPEX's general conditions of 1 Nov 2025 bar using its data to train, develop, fine-tune, validate or enhance any AI system or algorithmic process without written consent. Euronext said on 13 Jul 2026 that, under its market data agreements, feeding its data into an AI application is non-display use and AI output that discloses the data to third parties is redistribution. EEX requires a separate licence for AI use of DataSource products. Nord Pool's licences say nothing on AI, so ask in writing.

Where can I get EPEX SPOT historical data legally?

From EPEX SPOT itself, through the EEX Group webshop: subscriptions updated daily or one-off historical data files, for internal use within the legal entity that buys them. Display on a website, indexation and redistribution count as external use and need a separate agreement with EPEX SPOT. Or from a licensed data vendor, on the terms of your contract. ENTSO-E and SMARD show EPEX day-ahead prices for free, but their terms leave the rights with the exchange, so republishing them or feeding them to an AI model still needs EPEX SPOT's agreement.

Does Nord Pool have an API for its market data?

Yes. Nord Pool sells its power market data through a JSON API and its Data Portal, where historical datasets go back to 1992, on annual subscriptions. The licences run on the Euronext Group Data Product Agreement and Nord Pool's product terms from 1 Jan 2026, including internal use, view-only, non-display and full redistribution licences. Nord Pool's website terms forbid republishing without its consent and automatic extraction of data. Its licences say nothing on AI, so get that use in writing.

Is there a free API for EU gas storage?

Yes: GIE AGSI+, free with a key in an x-key header, returning JSON, and open to re-use with credit to GIE. Its values change after first publication: in our capture from 23 Sep to 28 Oct 2026, 14 of 36 EU gas days were corrected, all upward. Read that as a minimum.

Does European energy data get corrected after it is published?

Often. In Voltstack's capture from 23 Sep to 28 Oct 2026, 14 of 36 gas days of EU storage volume (GIE AGSI+) and 31 of 39 gas days of EU LNG send-out (GIE ALSI) were corrected, as were 66% of quarter-hours of Spain's surplus imbalance price and 67% of its deficit price on the ENTSO-E Transparency Platform. All are minimums. The paper is at https://doi.org/10.5281/zenodo.23749147.

Can I use JAO data in an AI model?

Not without JAO's written authorisation. JAO's terms, rewritten in 2026 and in place by 15 Oct 2026, bar making its content, including derived outputs, available to any third party without its prior written authorisation, and prohibit training machine-learning models or developing AI in its registered areas without authorisation.

What is the best commercial energy data API?

For builders, Energy Quantified (part of Montel), with REST, a WebSocket feed and a Python SDK. Kpler leads for LNG and pipeline flows; ICIS, Platts and Argus for price assessments. What you may do with their data in an AI model is set by your contract, so ask for that use by name before you sign.

Which free European energy sources can an AI agent use?

With credit: ENTSO-E's free re-use items, GIE AGSI+ and ALSI, Elexon BMRS (not its Market Index series), the NESO Data Portal, NVE's reservoir statistics and Gassco. Get it in writing first for ENTSOG and RTE. Leave out exchange prices by any route, JAO, Nord Pool UMM, netztransparenz.de, FRED and Open-Meteo's free tier.
Voltstack Analytics

Keep both values, with the time each was seen

If a desk keeps only the latest value, it cannot later show what the number said when it acted. If it keeps only the first, it carries figures that were later changed. Voltstack keeps each value it reads with the time it read it, for the series and start dates in the disclosed entry above.

Start a 14-day free trialRequest early access →or see the live demo

The button opens a 14-day free trial sign-up. Sign-up needs a work email.

The button opens the early-access request on our home page.

Related Voltstack Intelligence

More European energy reference

RATINGS · 2026 EDITION
Best European Energy Data APIs & Terminals (2026)
The previous edition, with integration notes and list prices as of 24 Sep 2026.
STRUCTURAL REFERENCE
2026 European Gas & Power Data Provider Ratings
Data providers rated across PRAs, analytics platforms and alternative data.
LIVE DATA
LNG Send-Out in Europe This Week, by Country
Weekly EU LNG send-out from GIE ALSI+, by country and terminal.

Disclaimer: This reference is produced by Voltstack Intelligence for informational purposes only and is not a vendor endorsement or legal advice. Scores reflect Voltstack's builder-centric assessment, set in June 2026 and re-checked on 24 Sep 2026. The licence column is our reading of each source's published terms on 20 Oct 2026, with JAO, Euronext, EPEX and EEX read again on 29 Oct 2026; check the terms yourself before you rely on them. Voltstack appears as a disclosed, self-assessed entry and is not rated or ranked. Voltstack does not accept payment from listed providers. Corrections to research@voltstack.energy.

Sources: the terms of use, licences and data usage pages of ENTSO-E, GIE, ENTSOG, Elexon, NESO, NVE, Gassco, National Gas, SMARD (Bundesnetzagentur), RTE, JAO, netztransparenz.de, Nord Pool, Euronext, EPEX SPOT, EEX, Open-Meteo and FRED; the EPEX SPOT offer on the EEX Group webshop and Nord Pool's Data Portal and data services pages, read on 6 Nov 2026; and written replies from Gassco, National Gas and the German TSOs; corrections measured from Voltstack's own capture, 23 Sep to 28 Oct 2026 (doi:10.5281/zenodo.23749147).

VOLTSTACK INTELLIGENCE · BUILDER REFERENCE · REVIEWED 29 OCT 2026voltstack.energy