Best European Energy Data Platforms for AI Agents (2027)
Which European power and gas data an MCP-compatible assistant or agent can reach, and which of it the licence lets the agent use. Reachable is not the same as allowed.
Reviewed ; next review 15 Jan 2027
For open fundamentals, connect an agent to Elexon (GB power), GIE AGSI+ and ALSI (gas storage and LNG) and items on ENTSO-E's free re-use list, and pass on each credit line. For paid forecasts, Energy Aspects' MCP server is the most complete connector we read. Do not wire exchange day-ahead prices into an agent without the exchange's written consent.
Much of the data an agent can reach today comes through a small open-source server that wraps a public API. The server's licence covers its code. It says nothing about the data, and the series people ask for most in European power, the exchange day-ahead prices, should not go into a model without the exchange's say-so.
An agent that can reach the data is not always allowed to use it
The Model Context Protocol (MCP) lets an assistant call a tool, and a tool can be any API. So the question a builder asks first, “is there an MCP server for it?”, is nearly always yes. The question that decides whether you can ship is what the owner of the data allows. Licences attach to the data, not to the wrapper, and no community server can grant rights its upstream does not.
Four sets of terms do most of the blocking in European power and gas:
- Exchange prices. EPEX SPOT's general conditions of 1 Nov 2025 bar its contracting parties from using its market data for training, developing, fine-tuning, validating or enhancing any AI system or algorithmic process without written consent. Euronext, whose group terms now cover licensed Nord Pool data, said on 13 Jul 2026, for its own market data agreements, that feeding market data into an AI application is non-display use and that AI output disclosing data to third parties is redistribution. Day-ahead prices republished on ENTSO-E (12.1.D) still need the exchange's agreement under ENTSO-E's own terms. SMARD labels its market data CC BY 4.0, but says it is reviewing how wholesale prices are licensed and names the exchanges as their primary owners.
- ENTSO-E outside its free list. Only the items on ENTSO-E's free re-use list are CC BY 4.0. Day-ahead prices (12.1.D), actual total load and generation are not on it; using them needs the owner's agreement, and the rights cannot be sub-licensed.
- JAO. Its terms, rewritten after 10 Jun 2026, bar making content, including derived outputs, available to any third party without written authorisation, and list training machine-learning models among restricted uses.
- Nord Pool REMIT UMM. Its general terms (Nov 2024) forbid redistribution and automatic extraction; internal analysis is allowed.
Licences and vendor terms were read on 23 Nov 2026, each from the publisher's own text. This is a reading of published terms, not legal advice. Where a verdict below says “get it in writing”, the terms neither grant nor bar the use clearly enough to build on.
Three questions, in this order
- Does the licence let an agent use the data and pass on what it says? This decides the rank on its own: a well-built connector to data you may not use ranks below a plain API you may.
- Can an agent connect today without custom glue: a live MCP server, or a REST API with a published schema, against a demo request or nothing at all.
- Can it ask what a value was before a correction (an as-of or vintage query), or only what the value is now?
Within the first question the tiers run: open with credit; allowed under a subscription; allowed with conditions; get it in writing; not stated; no; no energy data yet. Ties go to wider European power and gas coverage. We do not score: a number would hide which of the three questions a provider failed. Every vendor entry was checked against the vendor's own pages on 23 Nov 2026; where a page did not say, the row says “not stated”. For APIs ranked on developer experience, latency and cost, see our best European energy data APIs (2027).
14 providers, ranked for AI agents
| # | Provider | Data covered | How an agent connects | Auth | Licence allows AI use | Past values kept (as_of) | Price signal |
|---|---|---|---|---|---|---|---|
| 01 | Elexon BMRS (Insights) | GB power: generation by fuel, demand, balancing mechanism, imbalance prices, the Market Index (MID). | REST with a published OpenAPI document; a community MCP server wraps it. | None | Yes, with creditCommercial re-use allowed with the line "Contains BMRS data © Elexon Limited copyright and database right". Leave MID out: it comes from the N2EX and APX exchanges, and the licence excludes third-party rights Elexon cannot license. | Not measured by us. | Free |
| 02 | GIE AGSI+ and ALSI | EU gas storage and LNG terminals, daily, by country and site. | REST, JSON; community MCP servers wrap AGSI+. | Free key in an x-key header | Yes, with creditFree to the public, and naming GIE as the source is mandatory. GIE may withdraw a key whose user leaves the credit out. | No as-of query: a re-read returns the corrected value. 14 of 36 EU storage gas days and 31 of 39 EU LNG send-out gas days were corrected after first publication, 23 Sep to 28 Oct 2026, a minimum. | Free |
| 03 | MaStR (Marktstammdatenregister) | Germany's register of generation, storage and consumption units and market actors. No prices. | Community MCP server (MIT, listed in the official MCP registry). | None for 7 tools; a MaStR account for the 14 web-service tools | Yes, with creditDatenlizenz Deutschland Namensnennung 2.0 for the downloads and the web service. The key-free tools read the website's search results, which that statement does not name, so prefer the web-service tools. | No. The register is a current record. | Free |
| 04 | ENTSO-E Transparency Platform (free re-use items) | Load forecasts (6.1.B to E), cross-border physical flows (12.1.G), transfer capacities, redispatch (13.1), balancing and imbalance (17). | REST, XML. Community MCP servers (Pipeworx's ENTSO-E pack, entsoemcp.com) reach its flows and balancing data, but also serve day-ahead prices, actual load and generation, which are not on the free list, so switch those tools off. | Free security token, requested by email | Yes, with creditCC BY 4.0 for the items on its free re-use list (18 Oct 2023), with IFA and Nemo Link data left out. Day-ahead prices (12.1.D), actual total load and generation are not on the list. Read 23 Nov 2026. | No as-of query. 66% of Spanish surplus-price quarter-hours were corrected, 23 Sep to 28 Oct 2026, a minimum. | Free |
| 05 | Energy Aspects | Forecasts and balances for European power (Germany, France, Spain, UK, Netherlands, Belgium) and gas hubs (NBP, TTF, Zeebrugge, NCG); research. Its MCP docs do not list regions. | Vendor MCP server, live (docs v1.2, Oct 2026), four read-only tools. | OAuth 2.1 with PKCE and an mcp_access entitlement | Yes, under the subscriptionMCP setup is included in every subscription. Training or fine-tuning a model needs a separate Training Licence. | Yes. A release_date parameter returns data as it appeared at that release. | No list price; MCP comes with the subscription |
| 06 | S&P Global Energy (Platts) | AI Ready Data: news, reports, commentary and fundamentals, global. Its gas and power MCP server covers the Americas; we could not confirm European power or gas assessments through MCP. | Vendor MCP servers, live. | OAuth client credentials | Yes, under the subscriptionAn AI Addendum gives express permission to use its data in generative AI, retrieval and agentic workflows. | Yes for AI Ready Data: point in time, history from 2021. | None published |
| 07 | Kpler | Power in 48 European countries; European gas flows, storage, LNG and tariffs. | Vendor MCP server, live, read-only, for subscriptions with MCP access enabled (ask your account manager, or request access on its site); an in-terminal assistant and agents. | OAuth sign-in with a Kpler account; the subscription needs MCP access enabled | Yes, with conditionsMaster Agreement 4.5 lets a model query the data if access stays with authorised users and nothing is trained on it. The website's terms (s. 5) bar language models and agents from the website itself without written consent. | Compares current and previous power forecasts. | Demo request; none published |
| 08 | ENTSOG Transparency Platform | Gas flows, nominations and capacities at European interconnection points. | Keyless REST. No dedicated MCP server; SIGNALS MCP reads its flows. | None | Get it in writingIts terms (TRA0394-16 Rev. 3, 24 Sep 2018) let you download, store and use the data and set a citation form, ENTSOG TP [date] and the URL, but give no express right to redistribute. | Not measured by us. | Free |
| 09 | Modo Energy | Battery storage benchmarks, forecasts and research for GB, Germany, Spain, France, Italy and Poland, plus markets outside Europe. | Vendor MCP server, live, read-only. | OAuth with your Modo login; a free account works, some data needs a subscription | Not statedNo AI clause in its public website terms. Clause 4 bars using the data "to construct a database of any kind", so read your subscription before an agent stores answers. | Forecast runs can be compared; depth not stated. | Free plan; Business and Enterprise by quote |
| 10 | Aurora Energy Research | Power market forecasts across more than 50 markets, about 25 of them European. | EOS MCP, launched 12 Oct 2026 and moving to general availability. | Aurora account sign-in | Not statedNot stated in the launch release, and we could not read terms covering AI use on its site. | Not stated. | None published |
| 11 | Volue Insight | Forecasts and fundamentals for European power and gas. | REST and a Python library; no MCP server found. An "AI Analyst" tile on its forecasts page has no description, so we did not assess it. | OAuth client credentials | Not statedIts data licence is not public, and we found no AI clause on a public page. Ask before you wire it up. | Yes. Instance curves keep one series per issue date. | Demo request; none published |
| 12 | Argus Media | Price assessments, news, commentary and analysis. Gas and power scope for its AI products is not stated. | Its FAQ lists MCP among delivery routes, but we found no endpoint or documentation; an assistant runs inside Argus Direct. | Not stated | No, without a licenceIts public terms of use (14 May 2024) bar machine learning and AI use of Argus content; a subscription that says otherwise takes precedence. | Up to 20 years of history; point in time not stated. | No published price; no-cost trial |
| 13 | Montel and Energy Quantified | European power data and forecasts, prices and news. | No assistant or MCP server generally available. REST API, Python client and Excel; an assistant is described as in development (Aug 2026). | API key | No, without a licenceTerms of Service cl. 4.5.1, in force from 15 Dec 2025, prohibit inputting or processing any data with AI technologies, with no consent route. | Yes. Forecast instances carry an issue date. | 14-day free trial; none published |
| 14 | LSEG | Its MCP server covers fixed income, macro data, company fundamentals, estimates and news. No energy or commodities in scope. | LSEG-managed MCP server, in a phased rollout. | Existing LSEG credentials; entitlements carry over | No energy data yetYour licensed entitlements govern what the agent sees, but no power or gas data is offered through it today. | Not stated. | None published |
| × | Exchange day-ahead and intraday prices (EPEX SPOT, Nord Pool), by any route | Auction and continuous trading results, often republished by transparency platforms and community servers. | Many community MCP servers and republishers serve them. | Varies | No, without a licenceEPEX SPOT's general conditions (1 Nov 2025) bar its contracting parties from using its data to train, develop, fine-tune, validate or enhance any AI system without written consent. Euronext's AI statement (13 Jul 2026), written for its own market data agreements, treats AI ingestion as non-display use and AI output to third parties as redistribution. Copies on ENTSO-E (12.1.D) are not open either, and SMARD, which labels its market data CC BY 4.0, says it is reviewing how wholesale prices are licensed. Read 23 Nov 2026. | Not applicable. | Exchange licence fees |
| * | Voltstack (self-assessed) | Power fundamentals (flows, imbalance prices, GB balancing), EU gas storage, LNG, pipeline flows and carbon auction series built on official sources. The API does not serve day-ahead prices, and weather goes only to keys licensed for it. | REST /v1 with as_of; MCP server in build, not live. | X-API-Key, issued on request by email; no key gives a labelled sample of the series it serves | Depends on the seriesDepends on the series. Each response names its upstream source. The API serves only series whose open licence or a written grant allows it and answers HTTP 451 for the rest, day-ahead prices included. Voltstack grants no right a source does not give. | Yes, on /v1/history for EU gas storage and LNG terminals, from 23 Sep 2026. Capture runs forward only; nothing earlier is reconstructed. | No published price |
Why the as_of column is there
Public data is corrected after it is first published, and an agent that reads an API today gets today's value. We counted how often in Voltstack's own capture from 23 Sep to 28 Oct 2026: 14 of 36 gas days of EU storage volume (GIE AGSI+) and 31 of 39 gas days of EU LNG send-out (GIE ALSI) were corrected after first publication, and so were 66% of Spanish surplus-price quarter-hours on the ENTSO-E Transparency Platform. Our capture re-reads each series for a limited window, so read all three as a minimum.
The method, the counting rule and its limits are in the paper Values that move (doi.org/10.5281/zenodo.23749147), and the change records are in its dataset. If an agent's answer will be checked against what a desk saw when it traded, it needs an as-of query or a store of what it read and when.
Good for open data, with a licence catch
Community servers are the quickest way to give an assistant European energy data, and most are a single maintainer's work from the last few months. None of them keeps past values: each passes the upstream's current answer through. Read the catch before you switch one on.
| Server | Code | What it serves | Upstream | Auth | Licence allows AI use |
|---|---|---|---|---|---|
| Elexon BMRS MCP | MIT client for the hosted Pipeworx gateway, last commit 9 Nov 2026 | Generation by fuel, demand and imbalance prices, plus a query tool over 84 BMRS datasets. | Elexon Insights API | None for 50 calls a day; a free Pipeworx account raises it to 200 | Yes, with creditThe query tool reaches MID, which carries exchange rights. Keep that dataset off and pass on the Elexon line. |
| MaStR MCP | MIT, release 1.0.1, 15 Apr 2026 | German generation, storage and consumption units and market actors. | Marktstammdatenregister website and web service | None, or a MaStR account for the web-service tools | Yes, with creditThe licence statement names the web service and the site's .xml and .csv files, not the search results the key-free tools read. |
| GIE storage MCP | MIT client for the hosted Pipeworx gateway, last commit 9 Nov 2026 | GIE AGSI+ gas storage and ALSI+ LNG terminal levels, the facility directory and outage reports. | GIE AGSI+ and ALSI+ | None for 50 calls a day: it runs on the maintainer's own GIE key | Yes, with creditGIE makes the source credit mandatory. Pass your own key as _apiKey so the credit and the key are yours; calls still go through the Pipeworx gateway. |
| Energy-Charts MCP | MIT client for the hosted Pipeworx gateway, last commit 9 Nov 2026 | Generation mix, installed capacity, renewable share, and day-ahead prices by bidding zone. | Energy-Charts API (Fraunhofer ISE) | None for 50 calls a day; a free Pipeworx account raises it to 200 | Depends on the seriesEnergy-Charts licenses its data CC BY 4.0 unless stated otherwise. It labels prices in 16 zones CC BY 4.0 from SMARD and the rest "for private and internal use only". Those prices are exchange auction results, so keep the price tool off. |
| euenergy-mcp | No licence file; v0.1.0, 22 Jun 2026 | Day-ahead prices for about 41 bidding zones, plus average load in a cross-zone summary. | euenergy.live, which says its prices come from ENTSO-E | Free euenergy.live token | No, without a licenceeuenergy.live says it republishes under CC BY 4.0, but day-ahead prices are not on ENTSO-E's free re-use list. The code has no licence either. |
| SIGNALS MCP | No licence file; no changes since 2 Mar 2026 | ENTSOG Norwegian flows and messages, AGSI+ EU storage, UK generation mix, temperature, TTF, Brent and EUA quotes, an implied power price. | ENTSOG, GIE, carbonintensity.org.uk, Open-Meteo, Yahoo Finance | An AGSI+ key, written into the source | Depends on the seriesTTF, Brent and EUA are exchange prices taken from a quote site, and the free Open-Meteo API is for non-commercial use. Use the ENTSOG and GIE parts only, on your own key. |
Repositories, licences and commit dates were read on 23 Nov 2026. Where several servers share a name we list the most recent, and a code licence of MIT is about the server, not the data.
Voltstack (self-assessed): REST /v1 with as_of; MCP server in build, not live
Voltstack is a workspace and API that collects official European power and gas data. It has no MCP server for its data API today. One is in build, and this entry will change when it ships. What an agent can use now is the REST API, as it behaves on 23 Nov 2026:
- A read-only JSON API at
https://api.voltstack.energy/v1, with GET endpoints for power, gas, carbon auction and history series built on official sources. It serves only series whose open licence or a written grant allows it; everything else, day-ahead prices included, answers HTTP 451 with or without a key, and weather forecasts go only to keys licensed for them. - Keys go in an
X-API-Keyheader and are issued on request by email to research@voltstack.energy. Without a key, those series come as a labelled sample, and history endpoints serve only the last 30 days. /v1/historyfor EU gas storage and LNG terminals acceptsas_of, an instant with a timezone, and returns the series as Voltstack had captured it then. Capture for those two began on 23 Sep 2026, runs forward only, and anas_ofbefore it is refused with the start date in the body.- Each response names its upstream source, which tells the agent whose credit line to carry. Voltstack grants no right a source does not give, so the licence verdicts above apply to data you reach through it.
- No OpenAPI document and no SDK; the specification is an HTML and PDF document. No published price.
Where it sits against the three questions: the licence depends on the series, as it does for any republisher; an agent connects over REST with no tool schema yet; and the as-of query is the part we would point a builder to, within the start dates above.
Request early access →The button opens the early-access request on our home page.
Open sources only, with their credit lines
For an analyst whose firm has just rolled out an MCP-compatible assistant and wants European fundamentals in it this week, without a licence negotiation:
- Connect Elexon (GB power), GIE AGSI+ and ALSI (storage and LNG), MaStR (German assets) and, through your own code or a vetted server, ENTSO-E's free re-use items (flows, load forecasts, imbalance). Run each on your own key where one is needed.
- Switch off what you may not use: the Elexon Market Index dataset, any day-ahead price tool (Energy-Charts prices, euenergy-mcp), and quote-site prices.
- Make each tool return its credit line and the time it read the value, and tell the assistant to quote both in every answer.
- Keep a log of what the assistant read and when. The upstream will correct some of it, and the log is how you show what it saw.
| Source | Credit line to carry |
|---|---|
| Elexon BMRS | Contains BMRS data © Elexon Limited copyright and database right [year], with a link to the BMRS licence. |
| GIE AGSI+ and ALSI | Name GIE and the platform (AGSI+ or ALSI) as the source. |
| ENTSO-E (free re-use items) | "ENTSO-E Transparency Platform", a link to CC BY 4.0, and a note of any changes you made. |
| NESO Data Portal | "Supported by National Energy SO Open Data". |
| NVE reservoir statistics | Name NVE, link NLOD 2.0 and the service, and mark changes. |
| MaStR | Name the Bundesnetzagentur and Datenlizenz Deutschland Namensnennung 2.0. |
CC BY and NLOD also stop you adding terms that restrict the next user, so do not pass this data on under conditions stricter than the publisher's.
First edition, 23 Nov 2026
- This is the first edition. The next review is due on 15 Jan 2027, and we plan to re-read every entry each January and July.
- Two things we expected did not hold up on the vendors' own pages: Volue's “AI Analyst” has only a one-line description and no documentation we could assess, and LSEG's MCP server carries no energy data. Both are listed as found.
- Aurora launched its EOS MCP on 12 Oct 2026. Montel's current terms, in force from 15 Dec 2025, carry the AI clause quoted in the table.
Frequently asked questions
Which European energy data can an AI agent use without a separate licence?
Can I give EPEX or Nord Pool day-ahead prices to an AI assistant?
Is there an MCP server for European power prices?
Which energy data vendors offer an MCP server?
Does a CC BY label on a republishing site make exchange prices open?
What credit lines does an agent need to carry for open energy data?
Why does an AI agent need past values (as_of)?
Does Voltstack have an MCP server?
Official European power and gas data through one API
Voltstack reads official European power and gas sources and puts the data into dashboards, alerts and the /v1 API. For the series it versions, it keeps each value it captured, with the time it captured it, from that series' start date. The self-assessed entry above says what it does and does not do today.
The button opens the early-access request on our home page.
More on European energy data
Disclaimer: This reference is produced by Voltstack Intelligence for information only. It is a reading of published terms on the dates given, not legal advice and not a vendor endorsement. We build Voltstack, which appears as a self-assessed entry and is not ranked. Voltstack takes no payment from the providers listed. Corrections to research@voltstack.energy.
Sources:
- Elexon, Licence to use BMRS open data, read 23 Nov 2026
- GIE AGSI+, data usage, read 23 Nov 2026
- Marktstammdatenregister, data download and licence, read 23 Nov 2026
- ENTSO-E, List of Data Available for Free Re-use (18 Oct 2023) and Terms of Use, via the Transparency Platform help centre, read 23 Nov 2026
- ENTSOG, Privacy Policy and Terms and Conditions of Use (TRA0394-16 Rev. 3), read 23 Nov 2026
- Energy-Charts API documentation and licence notes, read 23 Nov 2026
- EPEX SPOT, General Conditions of Market Data use (1 Nov 2025), read 23 Nov 2026
- Euronext, statement on AI use under its market data agreements (13 Jul 2026), read 23 Nov 2026
- Energy Aspects, MCP documentation, read 23 Nov 2026
- Energy Aspects, AI solutions (subscription and Training Licence), read 23 Nov 2026
- Energy Aspects, Europe power coverage, read 23 Nov 2026
- Energy Aspects, Europe gas coverage, read 23 Nov 2026
- S&P Global Energy, MCP developer portal and AI page, read 23 Nov 2026
- Kpler, Master Agreement and terms of use, read 23 Nov 2026
- Modo Energy, MCP set-up guide and website terms, read 23 Nov 2026
- Aurora Energy Research, EOS MCP launch release, read 23 Nov 2026
- Volue, Data and Forecasts and Insight time series docs, read 23 Nov 2026
- Argus Media, terms of use and AI-ready data, read 23 Nov 2026
- Montel, Terms of Service, read 23 Nov 2026
- LSEG, MCP server, read 23 Nov 2026